YAR believes additional resources at Plomosas may be found:
- multiple geological layers
- Down dip of current resources; and
- Along strike.
Only 600m of 4,000m strike of immediate mine area has been part drilled, with YAR continuing its mapping and drilling activities. There are highly prospective targets defined within immediate mine area, with a prospective sequence that is 4,000m along strike and 900m down dip. Underground access is available for drilling along the 4km of strike. In addition, recent successful mapping has confirmed regional targets on a 7km mineralised sequence, which require follow-up drilling.